School Building Project

Employer

Ministry of Education and Science of the Russian Federation

Location

Russian Federation

Project Duration

2011

Construction Site

38.210 m²

Category

EDUCATION & HEALTH & SUPERSTRUCTURE

Megiz Construction undertook the critical construction finishing works on this 38,210 m² high-volume educational investment in the Russian Federation, ensuring the building's compliance with winter conditions and local building norms. The project required not only standard construction practices, but also the application of specialized materials and techniques suitable for the harsh climate requirements. This project is a concrete example of Megiz Construction's ability to deliver turnkey finishing solutions in international public projects.

Our Solutions - Detailed Work Performed

  • Wall Fabrications: Ytong wall productions, conventional plaster, perlite gypsum plaster and satin gypsum plaster productions.

  • Ground Works: Screed manufacturing and ground floor insulation works.

  • Veneer and Ceramics: Wet area wall tile manufacturing and general flooring ceramic manufacturing.

  • Painting Works: Wall water-based satin paint manufacturing, wall oil paint manufacturing and ceiling plastic paint applications.

  • Suspended Ceiling Systems: General suspended ceiling productions. Also, special plasterboard suspended ceilings and suspended ceilings for the gymnasium.